background

JIAHUI Fire Door Acceptance Standards??

?Q: What are the key acceptance criteria for JIAHUI fire doors during installation and final inspection??? ?A:?? JIAHUI fire doors must comply with rigorous national and industry standards to ensure fire integrity, structural stability, and operational reliability. The acceptance process spans three phases: ?pre-installation checks, ?installation execution, and ?post-installation validation. Below are the critical criteria: ?1. Pre-Installation Preparation? ?Dimensional Compliance: Wall opening dimensions must be verified before installation, with tolerances ??≤±5mm? in width/height. Deviations exceeding this require structural correction prior to door fitting. ?Embedded Components: All pre-embedded steel plates (e.g., anchor points) must undergo ?full-penetration welding. Welded joints require complete anti-rust coating (e.g., epoxy primer) to prevent corrosion. ?2. Installation Execution? ?Alignment Precision: Vertical deviation of the door frame: ??≤3mm per meter? (measured with a laser level). Horizontal deviation: ??≤2mm per meter? (checked via precision level). Frame misalignment compromises sealing and must be rectified immediately. ?Gap Management: Clearance between door leaf and frame must be ??≤3mm? on all sides (hinge, lock, top). Gaps exceeding this require adjustment or reseating. All seams must be filled with ?intumescent fire sealant? (e.g., graphite-based strips) to block smoke/flame penetration. ?Closer Calibration: After installation, door closers must enable automatic closure when the door is opened ?**≥90°. Closers failing to reset within ??≤60 seconds**? or exhibiting resistance >80N force are non-compliant. ?3. Final Inspection & Testing? ?Comprehensive Functional Checks: ?Seals: Fire-resistant seals (e.g., ceramic silicone strips) must adhere fully to the frame with ?zero gaps or peeling. ?Hardware: Hinges, locks, and closers must operate smoothly without jamming, deformation, or excessive force (>80N). ?Appearance: Surfaces must be free of dents, rust, or coating defects (per GB 12955-2008). ?Third-Party Performance Validation: Batch-sampled doors (minimum 1 per 50 units) must undergo independent laboratory testing per ?GB/T 7633? or ?ISO 834, including: ?Fire Resistance: Maintain structural integrity and insulation for rated duration (e.g., 90min for Grade A). ?Smoke Leakage: Air leakage ??≤1.5 m3/(m·h)?? at 50Pa pressure differential. Test reports must be submitted prior to project sign-off. ?Documentation & Compliance? ?Mandatory Records: Factory certifications (ISO/FM approval), product test reports, and installation logs. Third-party inspection certificates for耐火性能 (fire resistance) and气密性 (airtightness). ?Non-Conformance Handling: Doors failing any checkpoint require remediation (e.g., resealing, hardware replacement) and re-inspection. Persistent failures trigger batch rejection.
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.